Explore the divisions of Sindh, a major province in Pakistan with strategic coastal regions,
agricultural zones, and rapidly growing urban real estate hubs.
Governs land revenue, territorial administration, and overall land management across
Sindh.
Sindh Land Records
Authority (SLRA)
Responsible for digitization, maintenance, and verification of rural land records in
Sindh.
Sindh Local Government
& Housing Town Planning Department
Oversees urban development, housing schemes, town planning, and municipal
governance.
Sindh Building Control
Authority (SBCA)
Regulates building approvals, construction standards, and urban compliance within
Sindh.
Important Updates from Sindh
Real Estate & Land News
Published: September 21, 2026 at 12:01 PM
Karachi Development Projects Accelerated as Sindh Minister Reviews Major Road Schemes
کراچی کے ترقیاتی منصوبوں پر کام تیز کرنے کی ہدایت، سندھ کے وزیر بلدیات کا بڑے روڈ منصوبوں کا جائزہ
▫️Four major roads, Thado Nala bridge and Munawar Underpass reviewed as authorities ordered to speed up work and maintain construction quality
▫️4 بڑی سڑکوں، تھادو نالہ پل اور منور انڈرپاس کا معائنہ، تعمیراتی معیار برقرار رکھنے اور منصوبوں کی بروقت تکمیل پر زور
Karachi | ReNews PakistanSindh Minister for Local Government Syed Nasir Hussain Shah has reviewed the progress of major road, bridge...
Karachi | ReNews Pakistan Sindh Minister for Local Government Syed Nasir Hussain Shah has reviewed the progress of major road, bridge and underpass projects across Karachi, directing authorities to accelerate construction, maintain quality standards and complete schemes within or ahead of their scheduled timelines. During a detailed inspection of development works in Scheme 33, Malir Memon Goth and adjoining areas, the minister examined the pace and quality of ongoing infrastructure projects and received briefings from Karachi Development Authority (KDA) Director General Zainul Abideen Ansari and other officials. Officials said an 11.54-kilometre road project in Malir Memon Goth, costing approximately Rs1.428 billion, is currently under construction. Work began in February 2026 and is scheduled for completion within 24 months. The road will have a width of 7.3 metres and includes a 125-metre-long flyover. It is being developed from the Expressway through Malir River Road and is expected to strengthen connectivity between Malir Memon Goth, adjoining settlements and major highways. In Scheme 33, the minister was briefed on four major road projects currently under construction. A 24-kilometre dual carriageway project, estimated at Rs1.987 billion, has achieved around 70% completion, with authorities working to finish the scheme ahead of its scheduled deadline. The developing road network is also expected to improve connections between Scheme 33 and the M-9 Motorway and Super Highway. Officials said construction is also progressing on roads linking Mehran Road with Link Road, as well as Madras Road, Roomi Road and Sachal Sarmast Road. A bridge is also being constructed at Thado Nala alongside the road project, aimed at reducing transportation difficulties and improving traffic movement in the area. Shah also inspected the Munawar Underpass, where officials briefed him on construction progress and measures being taken to improve traffic flow. He directed the authorities to accelerate work while ensuring that construction meets the required standards. The minister said regular on-site inspections were being conducted to directly monitor the progress and quality of development schemes. He added that construction and rehabilitation work was under way on a large number of major and smaller roads across Karachi. According to Shah, the Sindh government has allocated funds for infrastructure development and assigned relevant institutions, including the Frontier Works Organisation (FWO), responsibilities for important projects. He said improving Karachi’s road infrastructure remains a major priority, particularly as the city faces growing population and traffic pressure. Alongside new roads, bridges and underpasses, authorities are working to strengthen connections between different parts of Karachi and major highways. The minister also said steps were being taken to strengthen local government institutions from the union council to town level so they could play a more effective role in providing basic civic services. On local government elections, Shah said the Election Commission of Pakistan has jurisdiction over the electoral process and expressed the Sindh government’s position that there should be no unnecessary delay in holding the polls. He also commented on the petroleum levy, saying the public should receive relief and facilitation amid rising petrol prices. On broader political issues, he said political differences should be resolved through democratic and peaceful means rather than violence.
کراچی | ری نیوز پاکستان سندھ کے وزیر بلدیات سید ناصر حسین شاہ نے کراچی میں جاری بڑے سڑکوں، پلوں اور انڈرپاس منصوبوں کی پیش رفت کا جائزہ لیتے ہوئے متعلقہ حکام کو ترقیاتی کاموں کی رفتار تیز کرنے، تعمیراتی معیار برقرار رکھنے اور منصوبوں کو مقررہ مدت میں یا اس سے پہلے مکمل کرنے کی ہدایت کی ہے۔ وزیر بلدیات نے سکیم 33، ملیر میمن گوٹھ اور ملحقہ علاقوں میں جاری ترقیاتی منصوبوں کا تفصیلی دورہ کیا، جہاں انہوں نے مختلف انفراسٹرکچر سکیموں پر کام کی رفتار اور معیار کا جائزہ لیا۔ کراچی ڈویلپمنٹ اتھارٹی (کے ڈی اے) کے ڈائریکٹر جنرل زین العابدین انصاری اور دیگر متعلقہ افسران نے انہیں منصوبوں کی لاگت، تکمیل کی مدت اور تعمیراتی پیش رفت پر تفصیلی بریفنگ دی۔ حکام نے بتایا کہ ملیر میمن گوٹھ میں 11.54 کلومیٹر طویل سڑک کی تعمیر جاری ہے، جس پر تقریباً 1.428 ارب روپے لاگت آئے گی۔ منصوبے پر کام فروری 2026 میں شروع کیا گیا تھا اور اسے 24 ماہ میں مکمل کرنے کا ہدف مقرر ہے۔ منصوبے کے تحت سڑک کی چوڑائی 7.3 میٹر ہوگی جبکہ اس میں 125 میٹر طویل فلائی اوور بھی شامل ہے۔ سڑک ایکسپریس وے سے ملیر ریور روڈ کے ذریعے تعمیر کی جا رہی ہے، جس کی تکمیل سے ملیر میمن گوٹھ، ملحقہ آبادیوں اور اہم شاہراہوں کے درمیان رابطہ بہتر ہونے کی توقع ہے۔ سکیم 33 میں جاری ترقیاتی منصوبوں کے حوالے سے وزیر بلدیات کو بتایا گیا کہ 4 بڑی سڑکوں پر تعمیراتی کام جاری ہے، جبکہ 24 کلومیٹر طویل ڈوئل کیرج وے منصوبے پر تقریباً 1.987 ارب روپے لاگت آئے گی اور اس کا 70 فیصد کام مکمل ہو چکا ہے۔ حکام کے مطابق ان منصوبوں کی تکمیل سے سکیم 33 اور ملحقہ علاقوں کے شہریوں کو آمدورفت کی بہتر سہولت میسر آئے گی اور علاقے کا ایم نائن موٹروے اور سپر ہائی وے سمیت اہم شاہراہوں سے رابطہ مزید بہتر ہوگا۔ بریفنگ میں بتایا گیا کہ مہرن روڈ کو لنک روڈ سے ملانے والی سڑک سمیت مدرس روڈ، رومی روڈ اور سچل سرمست روڈ پر بھی ترقیاتی کام جاری ہیں۔ تھادو نالہ پر سڑک کے ساتھ پل بھی تعمیر کیا جا رہا ہے، جس سے علاقے میں ٹریفک کی روانی بہتر اور آمدورفت کی مشکلات کم ہونے کی توقع ہے۔ سید ناصر حسین شاہ نے منور انڈرپاس کا بھی معائنہ کیا، جہاں انہیں تعمیراتی پیش رفت اور ٹریفک کی روانی بہتر بنانے کے اقدامات پر بریفنگ دی گئی۔ انہوں نے متعلقہ حکام کو ہدایت کی کہ کام کی رفتار تیز کی جائے اور تعمیراتی معیار پر کسی صورت سمجھوتہ نہ کیا جائے۔ صوبائی وزیر نے کہا کہ ترقیاتی منصوبوں کی رفتار اور معیار کی براہ راست نگرانی کے لیے باقاعدگی سے موقع پر جا کر معائنہ کیا جا رہا ہے۔ کراچی میں بڑی اور چھوٹی متعدد سڑکوں کی تعمیر و بحالی کا کام جاری ہے اور سندھ حکومت نے ان منصوبوں کے لیے فنڈز فراہم کیے ہیں۔ انہوں نے بتایا کہ کراچی کے اہم ترقیاتی منصوبوں کی تکمیل کے لیے متعلقہ اداروں، جن میں فرنٹیئر ورکس آرگنائزیشن (ایف ڈبلیو او) بھی شامل ہے، کو ذمہ داریاں سونپی گئی ہیں تاکہ ترقیاتی منصوبوں کے ثمرات شہریوں تک جلد پہنچ سکیں۔ ناصر حسین شاہ کے مطابق کراچی کی سڑکوں اور ٹرانسپورٹ انفراسٹرکچر کی بہتری حکومت کی اہم ترجیحات میں شامل ہے۔ نئی سڑکوں، پلوں اور انڈرپاسز کے ذریعے شہر کے مختلف علاقوں کو اہم شاہراہوں سے جوڑنے اور بڑھتے ہوئے ٹریفک دباؤ کو کم کرنے کے لیے اقدامات کیے جا رہے ہیں۔ انہوں نے کہا کہ یونین کونسل سے ٹاؤن کی سطح تک بلدیاتی اداروں کو مزید بااختیار بنانے کے لیے بھی اقدامات جاری ہیں تاکہ مقامی حکومت کا نظام شہریوں کو بنیادی بلدیاتی سہولیات کی مؤثر فراہمی میں زیادہ فعال کردار ادا کر سکے۔ بلدیاتی انتخابات سے متعلق سوال پر صوبائی وزیر نے کہا کہ انتخابات کا انعقاد الیکشن کمیشن آف پاکستان کے دائرہ اختیار میں ہے اور سندھ حکومت چاہتی ہے کہ بلدیاتی انتخابات میں بلاوجہ تاخیر نہ ہو۔ پیٹرولیم لیوی کے معاملے پر ناصر حسین شاہ نے کہا کہ پیٹرولیم مصنوعات کی قیمتوں میں اضافے کے تناظر میں عوام کو ریلیف اور سہولت فراہم کی جانی چاہیے۔ سیاسی معاملات پر گفتگو کرتے ہوئے انہوں نے کہا کہ کسی بھی مسئلے کا حل تشدد نہیں، بلکہ سیاسی اختلافات کو جمہوری اور پُرامن طریقے سے حل کیا جانا چاہیے۔
Published: September 21, 2026 at 10:01 AM
Karachi Anti Encroachment Operation Meets Resistance as Authorities Move to Reclaim 200 Acres of PSM Land
کراچی میں انسدادِ تجاوزات آپریشن مزاحمت کا شکار، پاکستان سٹیل ملز کی 200 ایکڑ زمین واگزار کرانے کی کوشش
▫️Protesters reject government action as illegal, claim disputed land belongs to the village and refuse to vacate
▫️مظاہرین کا حکومتی کارروائی کو غیر قانونی قرار دینے کا دعویٰ، متنازع زمین گاؤں کی ملکیت قرار دے کر خالی کرنے سے انکار
Karachi | ReNews PakistanA government led anti encroachment operation to reclaim around 200 acres of Pakistan Steel Mills (PSM) land...
Karachi | ReNews Pakistan A government led anti encroachment operation to reclaim around 200 acres of Pakistan Steel Mills (PSM) land in Karachi was temporarily suspended after authorities faced strong resistance from protesters, who allegedly pelted police and government vehicles with stones. A heavy contingent of Steel Town police, accompanied by officials from the district administration and Pakistan Steel Mills management, launched the operation to clear land allegedly occupied by encroachers. According to police, the operation was aimed at recovering around 200 acres of valuable PSM land allegedly under the control of a land-grabbing group. Tensions escalated when protesters resisted the operation and threw stones at police and government vehicles. A police mobile and several other official vehicles were reportedly damaged during the confrontation. As the situation became increasingly tense, authorities temporarily halted the operation to prevent further escalation. Police said legal action would be initiated against those involved in the violence and damage to government property. The protesters, however, rejected the authorities’ position and described the anti-encroachment operation as illegal. They claimed that the disputed land belonged to the village and said they would not vacate the area under any circumstances. The confrontation has left the status of the disputed land unresolved, with authorities maintaining that the land belongs to Pakistan Steel Mills and protesters disputing the government’s claim. The incident highlights the continuing challenges faced by authorities in recovering state-owned land amid disputes over ownership and occupation. Further action is expected once the authorities reassess the situation and security arrangements in the area.
کراچی | ری نیوز پاکستان کراچی میں پاکستان سٹیل ملز (پی ایس ایم) کی تقریباً 200 ایکڑ زمین واگزار کرانے کے لیے شروع کیا گیا انسدادِ تجاوزات آپریشن مظاہرین کی شدید مزاحمت کے باعث عارضی طور پر روک دیا گیا، مظاہرین نے مبینہ طور پر پولیس اور سرکاری گاڑیوں پر پتھراؤ کیا۔ سٹیل ٹاؤن پولیس کی بھاری نفری نے ضلعی انتظامیہ اور پاکستان سٹیل ملز کے حکام کے ہمراہ مبینہ طور پر قبضے میں لی گئی زمین واگزار کرانے کے لیے آپریشن شروع کیا۔ پولیس کے مطابق کارروائی کا مقصد پاکستان سٹیل ملز کی تقریباً 200 ایکڑ قیمتی اراضی واگزار کرانا تھا، جس پر مبینہ طور پر ایک گروپ نے قبضہ کر رکھا تھا۔ کارروائی کے دوران مظاہرین کی جانب سے مزاحمت کے بعد صورتحال کشیدہ ہوگئی اور پولیس و سرکاری گاڑیوں پر پتھراؤ کیا گیا۔ واقعے میں ایک پولیس موبائل سمیت متعدد سرکاری گاڑیوں کو نقصان پہنچنے کی اطلاع ہے۔ صورتحال مزید کشیدہ ہونے پر حکام نے کسی بھی ممکنہ تصادم سے بچنے کے لیے آپریشن عارضی طور پر روک دیا۔ پولیس نے کہا ہے کہ تشدد، سرکاری املاک کو نقصان پہنچانے اور کارروائی میں مزاحمت کرنے میں ملوث افراد کے خلاف قانونی کارروائی کی جائے گی۔ دوسری جانب مظاہرین نے حکام کے مؤقف کو مسترد کرتے ہوئے کارروائی کو غیر قانونی قرار دیا۔ ان کا دعویٰ ہے کہ متنازع زمین گاؤں کی ملکیت ہے اور وہ کسی صورت اسے خالی نہیں کریں گے۔ مذکورہ تنازع کے باعث زمین کی ملکیت اور قبضے کا معاملہ تاحال حل طلب ہے، جہاں حکام زمین کو پاکستان سٹیل ملز کی ملکیت قرار دے رہے ہیں جبکہ مظاہرین اس دعوے سے اختلاف کرتے ہیں۔ واقعہ سرکاری اراضی واگزار کرانے کی کارروائیوں میں ملکیت اور قبضے کے تنازعات کے باعث پیش آنے والے انتظامی اور قانونی چیلنجز کو نمایاں کرتا ہے۔ حکام کی جانب سے صورتحال اور سکیورٹی انتظامات کا جائزہ لینے کے بعد آئندہ کارروائی متوقع ہے۔
Published: September 20, 2026 at 1:01 AM
Sindh Orders Province-Wide Fire Safety Audits of School Buildings
سندھ میں سکول عمارتوں کے فائر سیفٹی آڈٹ کا حکم
▫️Schools directed to maintain alarms, extinguishers and emergency exits, conduct evacuation drills and train staff in fire response
▫️سکولوں کو فائر الارم، سموک ڈیٹیکٹرز اور فائر ایکسٹنگوشرز فعال رکھنے، ہنگامی راستے کھلے رکھنے کی ہدایت
Karachi | ReNews PakistanThe Sindh government has ordered comprehensive fire safety audits of school buildings across the province as part...
Karachi | ReNews Pakistan The Sindh government has ordered comprehensive fire safety audits of school buildings across the province as part of efforts to strengthen emergency preparedness and reduce fire related risks at educational institutions. Under the decision, relevant authorities will assess fire safety arrangements in schools and compile the findings for uploading to the website of the Provincial Disaster Management Authority (PDMA). The exercise is aimed at establishing a province-wide record of fire safety conditions and identifying gaps requiring corrective measures. According to a government notification, the School Education Department has appointed Deputy Secretary Ashraf Hussain Ansari as the focal person to coordinate matters related to the fire safety audits and facilitate communication among the departments and institutions concerned. The latest move follows fire safety directives issued by the Sindh Directorate of Inspection and Registration of Private Institutions in August. The directorate had instructed privately managed schools to ensure that all mandatory fire prevention and safety systems remain operational at all times. Schools were directed to install and regularly test fire alarms and smoke detectors, while suitable fire extinguishers were required on every floor and at other critical locations. Authorities also instructed schools to ensure that emergency exits, staircases and evacuation routes remain unlocked, clearly marked, adequately illuminated and free of obstructions. The safety requirements also cover periodic inspection of electrical wiring and switchboards, laboratories, kitchens, generator rooms and other areas identified as potential fire hazards. Educational institutions have further been instructed to display updated evacuation plans and emergency instructions at prominent locations. Schools are required to conduct at least three fire evacuation drills during each academic year and maintain proper records of the exercises. The directives also place emphasis on staff preparedness, requiring teaching and non-teaching personnel to receive training in fire emergency response, evacuation procedures and basic first aid. Through the province wide audit, the Sindh government is seeking to move beyond routine safety instructions toward systematic monitoring of fire preparedness in school buildings. The data collected through the process is expected to help authorities identify vulnerable institutions and improve compliance with prescribed fire safety standards.
کراچی | ری نیوز پاکستان سندھ حکومت نے تعلیمی اداروں میں ہنگامی صورتحال سے نمٹنے کی تیاریوں کو مؤثر بنانے اور آتشزدگی کے خطرات کم کرنے کے لیے صوبے بھر میں اسکولوں کی عمارتوں کے جامع فائر سیفٹی آڈٹ کرانے کا حکم دے دیا۔ فیصلے کے تحت متعلقہ حکام سکولوں میں فائر سیفٹی کے انتظامات کا جائزہ لے کر اس کی تفصیلات مرتب کریں گے، جنہیں صوبائی ڈیزاسٹر مینجمنٹ اتھارٹی (PDMA) کی ویب سائٹ پر اپ لوڈ کیا جائے گا۔ اس اقدام کا مقصد صوبے بھر کے سکولوں میں فائر سیفٹی کی صورتحال کا ریکارڈ مرتب کرنے کے ساتھ ساتھ حفاظتی انتظامات میں موجود خامیوں کی نشاندہی کرنا ہے۔ سرکاری نوٹیفکیشن کے مطابق محکمہ اسکول ایجوکیشن نے ڈپٹی سیکریٹری اشرف حسین انصاری کو فائر سیفٹی آڈٹ سے متعلق امور کے لیے فوکل پرسن مقرر کیا ہے، جو متعلقہ محکموں اور تعلیمی اداروں کے درمیان رابطہ کاری کے امور دیکھیں گے۔ یہ اقدام سندھ ڈائریکٹوریٹ آف انسپیکشن اینڈ رجسٹریشن آف پرائیویٹ انسٹی ٹیوشنز کی جانب سے اگست میں جاری کی گئی فائر سیفٹی ہدایات کے بعد سامنے آیا ہے۔ ڈائریکٹوریٹ نے تمام نجی سکولوں کو ہدایت کی تھی کہ آگ سے بچاؤ اور فائر سیفٹی کے لیے ضروری تمام نظام ہر وقت فعال حالت میں رکھے جائیں۔ سکولوں کو فائر الارم اور اسموک ڈیٹیکٹرز نصب کرنے اور ان کی باقاعدگی سے جانچ کرنے کی ہدایت کی گئی تھی، جبکہ ہر منزل اور اہم مقامات پر موزوں فائر ایکسٹنگوشرز کی دستیابی بھی یقینی بنانے کا کہا گیا تھا۔ حکام نے سکولوں کو ہنگامی اخراج کے راستے، سیڑھیاں اور ایویکیویشن روٹس ہر وقت کھلے رکھنے، واضح نشانات لگانے، مناسب روشنی کا انتظام کرنے اور راستوں میں کسی بھی قسم کی رکاوٹ نہ رکھنے کی ہدایت بھی کی ہے۔ فائر سیفٹی اقدامات کے تحت بجلی کی وائرنگ اور سوئچ بورڈز، لیبارٹریز، کچن، جنریٹر رومز اور دیگر ممکنہ خطرناک مقامات کا باقاعدگی سے معائنہ بھی ضروری قرار دیا گیا ہے۔ تعلیمی اداروں کو تازہ ترین ایویکیویشن پلانز اور ہنگامی صورتحال سے متعلق ہدایات نمایاں مقامات پر آویزاں کرنے کی بھی ہدایت کی گئی ہے۔ اسکولوں کو ہر تعلیمی سال کے دوران کم از کم تین فائر ایویکیویشن ڈرلز کرانے اور ان کی مکمل دستاویزات محفوظ رکھنے کا پابند کیا گیا ہے۔ حفاظتی اقدامات کے ساتھ اسکولوں کے تدریسی اور غیر تدریسی عملے کی تربیت پر بھی زور دیا گیا ہے۔ عملے کو فائر ایمرجنسی سے نمٹنے، انخلا کے طریقہ کار اور ابتدائی طبی امداد سے متعلق بنیادی تربیت فراہم کرنے کی ہدایت کی گئی ہے۔ صوبے بھر میں فائر سیفٹی آڈٹ کا مقصد محض حفاظتی ہدایات جاری کرنے کے بجائے سکولوں میں فائر سیفٹی کی صورتحال کی باقاعدہ نگرانی اور ریکارڈ مرتب کرنا ہے۔ آڈٹ سے حاصل ہونے والے ڈیٹا کی مدد سے حکام حساس اور کمزور عمارتوں کی نشاندہی کرکے فائر سیفٹی کے مقررہ معیار پر عمل درآمد بہتر بنانے کے اقدامات کر سکیں گے۔