Explore the divisions of Sindh, a major province in Pakistan with strategic coastal regions,
agricultural zones, and rapidly growing urban real estate hubs.
Governs land revenue, territorial administration, and overall land management across
Sindh.
Sindh Land Records
Authority (SLRA)
Responsible for digitization, maintenance, and verification of rural land records in
Sindh.
Sindh Local Government
& Housing Town Planning Department
Oversees urban development, housing schemes, town planning, and municipal
governance.
Sindh Building Control
Authority (SBCA)
Regulates building approvals, construction standards, and urban compliance within
Sindh.
Important Updates from Sindh
Real Estate & Land News
Published: August 31, 2026 at 10:21 AM
Karachi Opens Rs 750 Million Korangi No 5 Flyover to Traffic
کراچی میں 75 کروڑ روپے کی لاگت سے کورنگی نمبر 5 فلائی اوور ٹریفک کیلئے کھول دیا گیا
▫️New Elevated Route to Improve Connectivity Between Ibrahim Hyderi, Shah Faisal Colony, Landhi and Korangi
▫️نیا فلائی اوور ابراہیم حیدری، شاہ فیصل کالونی، لانڈھی اور کورنگی کے درمیان رابطے کو بہتر بنائے گا
Karachi : ReNews PakistanKarachi Mayor Murtaza Wahab has inaugurated a newly constructed flyover at Korangi No 5, marking the completion...
Karachi : ReNews Pakistan Karachi Mayor Murtaza Wahab has inaugurated a newly constructed flyover at Korangi No 5, marking the completion of a major road infrastructure project costing nearly Rs 750 million. The facility has been opened to traffic with the objective of improving traffic flow and strengthening connectivity across several densely populated areas of the city. The inauguration ceremony was attended by Sindh Local Government Minister Nasir Hussain Shah, Pakistan Peoples Party representatives and other officials and political figures. According to Mayor Murtaza Wahab, the new flyover will provide an improved route connecting Ibrahim Hyderi, Shah Faisal Colony, Landhi and Korangi. The elevated structure is expected to facilitate smoother movement for motorists travelling between these residential, commercial and industrial areas. Korangi is one of Karachi’s key urban and industrial zones, where heavy traffic volumes frequently create congestion on major connecting roads. The new flyover is intended to provide a dedicated elevated passage at Korangi No 5, allowing traffic to move more efficiently and reducing pressure on intersections and adjoining roads. The project is particularly significant for residents and daily commuters who travel between Korangi, Landhi, Shah Faisal Colony and Ibrahim Hyderi. Improved road connectivity is expected to reduce travel delays and provide more convenient access between residential neighbourhoods and important commercial and employment centres. Mayor Wahab said the flyover forms part of the wider development programme being implemented across Karachi under the #KarachiWorks initiative. The initiative includes road and infrastructure projects aimed at improving mobility, upgrading the city’s transportation network and addressing longstanding traffic-related challenges. The completion of the Korangi No. 5 flyover adds to the ongoing efforts to expand and modernise Karachi’s road infrastructure. With increasing traffic volumes and continued urban expansion, authorities have been focusing on projects designed to improve road capacity and provide better connections between different parts of the metropolis. The opening of the flyover is therefore being viewed as an important addition to Karachi’s transport infrastructure, particularly for communities in the eastern and southeastern parts of the city. Authorities expect the facility to contribute to smoother traffic movement and improved connectivity as motorists begin using the new route.
کراچی : ری نیوز پاکستان کراچی کے میئر مرتضیٰ وہاب نے کورنگی نمبر 5 پر نو تعمیر شدہ فلائی اوور کا افتتاح کر دیا، جس کے بعد اسے ٹریفک کے لیے کھول دیا گیا ہے۔ تقریباً 75 کروڑ روپے کی لاگت سے مکمل ہونے والا یہ منصوبہ شہر کے مختلف گنجان آباد علاقوں کے درمیان ٹریفک کی روانی بہتر بنانے اور شہری رابطوں کو مضبوط کرنے کے لیے تعمیر کیا گیا ہے۔ افتتاحی تقریب میں سندھ کے وزیر بلدیات ناصر حسین شاہ، پاکستان پیپلز پارٹی کے رہنماؤں، منتخب نمائندوں اور دیگر متعلقہ شخصیات نے شرکت کی۔ میئر کراچی مرتضیٰ وہاب کے مطابق نیا فلائی اوور ابراہیم حیدری، شاہ فیصل کالونی، لانڈھی اور کورنگی کے درمیان آمدورفت کو بہتر بنانے میں اہم کردار ادا کرے گا۔ بلند گزرگاہ کے ذریعے ان علاقوں کے درمیان سفر کرنے والے شہریوں کو نسبتاً ہموار اور براہِ راست راستہ میسر آئے گا، جس سے ٹریفک کی روانی میں بہتری کی توقع ہے۔ کورنگی کراچی کے اہم شہری اور صنعتی علاقوں میں شمار ہوتا ہے، جہاں بڑھتی ہوئی آبادی، تجارتی سرگرمیوں اور روزانہ کی آمدورفت کے باعث مختلف اہم شاہراہوں اور چوراہوں پر ٹریفک کا دباؤ رہتا ہے۔ کورنگی نمبر 5 پر فلائی اوور کی تعمیر کا مقصد اسی دباؤ کو کم کرنا اور ٹریفک کے لیے ایک مخصوص بلند راستہ فراہم کرنا ہے۔ نئے منصوبے سے کورنگی، لانڈھی، شاہ فیصل کالونی اور ابراہیم حیدری کے درمیان روزانہ سفر کرنے والے شہریوں کو بھی سہولت ملنے کی توقع ہے۔ بہتر سڑک رابطوں کے نتیجے میں سفری وقت میں کمی اور رہائشی علاقوں کو اہم تجارتی و صنعتی مراکز سے زیادہ مؤثر انداز میں منسلک کرنے میں مدد مل سکتی ہے۔ مرتضیٰ وہاب نے کہا کہ کورنگی نمبر 5 فلائی اوور کراچی میں جاری وسیع تر ترقیاتی سرگرمیوں کا حصہ ہے۔ اس پروگرام کے تحت شہر میں سڑکوں، ٹریفک اور شہری انفراسٹرکچر سے متعلق مختلف منصوبوں پر کام جاری ہے، جن کا مقصد کراچی کے ٹرانسپورٹ نظام کو بہتر بنانا اور شہریوں کو بہتر سفری سہولیات فراہم کرنا ہے۔ کورنگی فلائی اوور کی تکمیل کراچی کے روڈ انفراسٹرکچر کو وسعت دینے اور جدید خطوط پر استوار کرنے کی جاری کوششوں میں ایک اور اہم پیش رفت قرار دی جا رہی ہے۔ شہر میں ٹریفک کے بڑھتے ہوئے حجم اور مسلسل شہری پھیلاؤ کے پیش نظر مختلف علاقوں کے درمیان بہتر رابطوں اور شاہراہوں کی استعداد بڑھانے کے لیے انفراسٹرکچر منصوبوں پر توجہ دی جا رہی ہے۔ حکام کو توقع ہے کہ کورنگی نمبر 5 فلائی اوور کے فعال ہونے سے شہر کے مشرقی اور جنوب مشرقی علاقوں میں ٹریفک کی روانی بہتر ہوگی، اہم شاہراہوں پر دباؤ کم ہوگا اور روزانہ سفر کرنے والے شہریوں کو آمدورفت میں سہولت میسر آئے گی۔
Published: August 31, 2026 at 9:59 AM
Serious Violations of Building Laws and Fire Safety Regulations Found in Gul Plaza Tragedy: Judicial Commission Report
گل پلازہ سانحہ میں بلڈنگ قوانین اور فائر سیفٹی نظام کی سنگین خلاف ورزیاں ہوئیں: رپورٹ جوڈیشیل کمیشن
▫️Emergency Exits, Fire Safety Equipment, Water and Lighting Deficiencies Identified as Major Causes of the Disaster
▫️ہنگامی اخراج، فائر سیفٹی آلات، پانی اور روشنی کا ناقص انتظام المیے کی بڑی وجوہات قرار
Karachi | ReNews PakistanThe Judicial Commission’s report on the Gul Plaza tragedy has raised serious questions over compliance with building...
Karachi | ReNews Pakistan The Judicial Commission’s report on the Gul Plaza tragedy has raised serious questions over compliance with building laws, fire safety regulations and emergency evacuation arrangements in Karachi. Rather than treating the incident merely as a fire, the report describes it as a failure of the existing provincial and municipal governance system, while identifying the absence of basic safety requirements in the building as a major factor behind the loss of lives. According to the available draft of the report, Gul Plaza lacked adequate arrangements to deal with emergencies. The absence of proper entry and exit routes and an effective emergency evacuation system, sealed windows, inadequate smoke ventilation, insufficient lighting and the lack of essential fire safety equipment severely hampered rescue efforts. The commission observed that the availability of safe evacuation routes and an effective emergency exit system could have helped reduce the loss of life. The report has also examined the role of the Sindh Building Control Authority (SBCA). According to the commission, the SBCA was primarily responsible for ensuring compliance with construction and safety requirements under the Karachi Building and Town Planning Regulations 2002. However, it failed to maintain the building’s history and related records in accordance with the audit framework and did not ensure effective monitoring. The commission also expressed concern over the lack of an effective mechanism for timely identification and rectification of violations of building safety standards. According to the report, building regulations should not be limited to granting permission for construction; safety requirements, including fire protection, emergency exits, electricity, lighting, water supply and access for rescue services, must also be continuously monitored throughout the operational life of a building. The report has also raised questions over the performance of the Civil Defence Department. According to the commission, the department was responsible for conducting advance inspections of buildings, identifying safety deficiencies, ensuring implementation of fire safety audits and providing relevant training on safety measures. However, these responsibilities were not effectively fulfilled. The commission further observed that the district administration failed to effectively utilise the fire audit mechanism. It also noted shortcomings in the supervision and performance of the Deputy Commissioner in relation to the enforcement of safety measures. Deficiencies in the emergency response system further aggravated the situation during the tragedy. According to the report, the Karachi Metropolitan Corporation (KMC), through its Fire Brigade, had the primary responsibility to reach the site promptly and conduct an effective rescue operation. The Fire Brigade told the commission that adequate water supplies were available. However, evidence presented during the proceedings indicated that the water supply ran out while firefighting operations were underway, creating further difficulties and contributing to the escalation of casualties. The commission also identified the shortage of essential firefighting and rescue equipment as a significant concern. Calls for help continued to come from people trapped inside the burning building, but the lack of adequate rescue equipment severely affected the effectiveness of the operation. The report also questioned the performance of Rescue 1122, stating that the service was unable to discharge its responsibilities effectively due to inadequate equipment. The commission highlighted the issue in view of the substantial public funds allocated annually to the emergency rescue system. According to the report, the Gul Plaza Managing Committee, which was present at the site in its administrative capacity, also failed to play an effective role in rescuing people trapped inside the building. However, the available draft of the commission’s report does not hold any specific individual directly responsible for the tragedy. Overall, the commission concluded that the Gul Plaza tragedy exposed serious weaknesses in the enforcement and monitoring of building safety and fire protection regulations, as well as in the emergency response mechanism. The report characterised the incident as a failure of the existing provincial and municipal governance system, particularly in protecting the lives and property of citizens. It is important to note that the available draft of the Judicial Commission’s report does not bear the signatures or official seal of any government officer or the commission. Therefore, its status and authenticity require separate official confirmation.
کراچی | ری نیوز پاکستان گل پلازہ سانحے سے متعلق جوڈیشل کمیشن کی رپورٹ نے کراچی میں عمارتوں کے بلڈنگ قوانین، فائر سیفٹی ضوابط اور ہنگامی اخراج کے انتظامات پر سنگین سوالات اٹھا دیے ہیں۔ رپورٹ میں سانحے کو محض آتش زدگی کا واقعہ قرار دینے کے بجائے صوبائی اور شہری حکومت کے موجودہ انتظامی نظام کی ناکامی قرار دیا گیا ہے، جبکہ عمارت میں بنیادی حفاظتی تقاضوں کی عدم موجودگی کو جانی نقصان میں اضافے کی اہم وجوہات میں شامل کیا گیا ہے۔ دستیاب مسودے کے مطابق گل پلازہ میں ہنگامی حالات سے نمٹنے کے لیے مطلوبہ انتظامات موجود نہیں تھے۔ عمارت میں مناسب داخلی و خارجی راستے اور ہنگامی اخراج کا مؤثر نظام نہ ہونے، کھڑکیوں کے بند ہونے، دھوئیں کے اخراج کے ناکافی انتظام، روشنی کے فقدان اور فائر سیفٹی آلات کی عدم دستیابی نے ریسکیو کارروائی کو انتہائی مشکل بنا دیا۔ کمیشن کے مطابق عمارت میں موجود لوگوں کے لیے محفوظ راستہ اور ہنگامی انخلا کا مؤثر نظام موجود ہوتا تو جانی نقصان کو کم کیا جا سکتا تھا۔ رپورٹ میں سندھ بلڈنگ کنٹرول اتھارٹی (ایس بی سی اے) کے کردار کو بھی خاص طور پر زیر بحث لایا گیا ہے۔ کمیشن کے مطابق ایس بی سی اے کی بنیادی ذمہ داری تھی کہ کراچی بلڈنگ اینڈ ٹاؤن پلاننگ ریگولیشنز 2002 کے تحت عمارت کے تعمیراتی اور حفاظتی تقاضوں پر عمل درآمد یقینی بناتا، تاہم عمارت سے متعلق بلڈنگ ہسٹری کا ریکارڈ اور آڈٹ ورک فریم کے مطابق نگرانی مؤثر انداز میں نہیں کی گئی۔ کمیشن نے اس امر پر بھی تشویش ظاہر کی کہ عمارتوں کے حفاظتی معیارات کی خلاف ورزیوں کی بروقت نشاندہی اور ان کے تدارک کے لیے مؤثر نظام موجود نہیں تھا۔ رپورٹ کے مطابق بلڈنگ قوانین صرف تعمیر کی اجازت تک محدود نہیں ہونے چاہئیں بلکہ عمارت کے استعمال کے دوران بھی فائر سیفٹی، ہنگامی اخراج، بجلی، روشنی، پانی اور ریسکیو رسائی جیسے تقاضوں کی مسلسل نگرانی ضروری ہے۔ رپورٹ میں سول ڈیفنس کے نظام پر بھی سوالات اٹھائے گئے ہیں۔ کمیشن کے مطابق متعلقہ ادارے کی ذمہ داری تھی کہ عمارتوں کا پیشگی معائنہ کرتا، حفاظتی خامیوں کی نشاندہی کرتا، فائر سیفٹی آڈٹ پر عمل درآمد یقینی بناتا اور متعلقہ افراد کو حفاظتی اقدامات کے حوالے سے تربیت فراہم کرتا، تاہم ان ذمہ داریوں کو مؤثر انداز میں ادا نہیں کیا گیا۔ کمیشن کے مطابق ضلعی انتظامیہ بھی فائر آڈٹ کے مؤثر طریقہ کار کو بروئے کار لانے میں ناکام رہی، جبکہ ڈپٹی کمشنر کی جانب سے مؤثر نگرانی اور انتظامی کارکردگی کا فقدان بھی رپورٹ میں نشاندہی کیے گئے عوامل میں شامل ہے۔ سانحے کے دوران ریسکیو نظام کی خامیوں نے صورتحال کو مزید سنگین بنا دیا۔ رپورٹ کے مطابق کراچی میونسپل کارپوریشن (کے ایم سی) کے فائر بریگیڈ کی بنیادی ذمہ داری تھی کہ وہ بروقت جائے وقوعہ پر پہنچ کر مؤثر ریسکیو آپریشن شروع کرتا۔ فائر بریگیڈ کی جانب سے کمیشن کو بتایا گیا کہ پانی کا مناسب ذخیرہ موجود تھا، تاہم کارروائی کے دوران سامنے آنے والے شواہد کے مطابق آگ بجھاتے ہوئے پانی ختم ہوگیا، جس سے ریسکیو آپریشن میں مزید مشکلات پیدا ہوئیں۔ کمیشن نے قرار دیا کہ فائر بریگیڈ کے پاس مطلوبہ آلات کی کمی بھی ایک اہم مسئلہ تھی۔ عمارت کے اندر پھنسے افراد کی جانب سے مدد کے لیے آوازیں آتی رہیں، لیکن دستیاب ریسکیو آلات کی کمی کے باعث امدادی کارروائی مؤثر انداز میں آگے نہ بڑھ سکی۔ رپورٹ میں ریسکیو 1122 کی کارکردگی پر بھی سوالات اٹھائے گئے اور کہا گیا کہ ادارہ مناسب آلات کی عدم دستیابی کے باعث اپنی ذمہ داریاں احسن انداز میں ادا نہیں کرسکا۔ کمیشن نے اس صورتحال کو اس لیے بھی اہم قرار دیا کہ ریسکیو نظام کے لیے ہر سال بڑے پیمانے پر سرکاری وسائل مختص کیے جاتے ہیں۔ رپورٹ کے مطابق گل پلازہ کی مینجنگ کمیٹی بھی عمارت میں موجود افراد کو بچانے کے لیے مؤثر کردار ادا کرنے میں ناکام رہی۔ تاہم کمیشن کے دستیاب مسودے میں کسی مخصوص فرد کو سانحے کا براہ راست ذمہ دار قرار نہیں دیا گیا۔ کمیشن نے مجموعی طور پر قرار دیا کہ گل پلازہ سانحہ عمارت کے حفاظتی اور فائر سیفٹی قوانین پر عمل درآمد، نگرانی اور ہنگامی ردعمل کے پورے نظام کی کمزوری کو ظاہر کرتا ہے۔ رپورٹ میں اس سانحے کو صوبائی اور شہری حکومت کے موجودہ نظام کی ناکامی قرار دیا گیا ہے۔ واضح رہے کہ دستیاب جوڈیشل کمیشن رپورٹ کے مسودے پر کسی سرکاری افسر یا کمیشن کے دستخط اور سرکاری مہر موجود نہیں، اس لیے اس کی حیثیت کے حوالے سے حتمی سرکاری تصدیق الگ معاملہ ہے۔
Published: August 29, 2026 at 5:04 PM
Karachi Mayor Inaugurates Rs233.5 Million Memon Goth Road Rehabilitation Project
میئر کراچی نے 23 کروڑ 35 لاکھ روپے کے میمن گوٹھ روڈ بحالی منصوبے کا افتتاح کر دیا
▫️Work Underway on Makran Road Links and Airport/Malir Cantt Dual Carriageway
▫️مکران روڈ سے منسلک سڑکوں اور ایئرپورٹ، ملیر کینٹ ڈوئل کیرج وے پر کام جاری
Karachi : ReNews PakistanKarachi Mayor Murtaza Wahab has inaugurated the rehabilitated Memon Goth Road, a major road infrastructure project completed...
Karachi : ReNews Pakistan Karachi Mayor Murtaza Wahab has inaugurated the rehabilitated Memon Goth Road, a major road infrastructure project completed at a cost of Rs 233.5 million, aimed at improving connectivity and easing traffic movement between Karachi and Malir. Speaking at the inauguration ceremony, the mayor said the rehabilitation of the road had significantly improved transportation facilities for residents and commuters using the route. He noted that improved road infrastructure had helped reduce travel time between the city and Malir to approximately 15 to 20 minutes, providing greater convenience to motorists and local communities. Wahab said the road project was carried out after completing essential supporting infrastructure works. According to him, traffic-related arrangements, sewerage works and base preparation were completed before the road construction and rehabilitation work began. The mayor emphasized that completing underground and foundational infrastructure before laying the roads was important for ensuring the durability of newly developed road networks and reducing the need for repeated excavation after completion. He further said that the Karachi administration was continuing work on several other road projects across the city. Construction and rehabilitation work on a number of roads along Makran Road has already commenced, while the tendering process for additional road projects is currently in progress. Wahab said these initiatives were part of broader efforts to improve Karachi's road network, strengthen connectivity between different areas and facilitate smoother traffic flow. He also highlighted progress on the proposed dual carriageway connecting Karachi Airport with Malir Cantt. The project is expected to provide an important transportation link between the airport, Malir and surrounding areas. According to the mayor, the planned connectivity will also extend toward Kathore and the rear side of the airport, ultimately linking these areas with the motorway. The development is expected to improve access to key transport corridors and support the movement of residents, businesses and commercial traffic. The ongoing road development projects reflect the city's focus on upgrading major transportation routes alongside essential municipal infrastructure. The administration has maintained that completing sewerage and other underground works before road construction can help prevent damage to newly built roads and ensure more sustainable urban development. With the Memon Goth Road rehabilitation now completed and additional projects moving into construction and tendering stages, authorities are seeking to expand and modernize Karachi's road infrastructure while improving travel times and connectivity across the metropolitan area.
کراچی : ری نیوز پاکستان کراچی کے میئر مرتضیٰ وہاب نے میمن گوٹھ روڈ کے بحالی منصوبے کا افتتاح کر دیا ہے، جس پر 23 کروڑ 35 لاکھ روپے لاگت آئی ہے۔ منصوبے کا مقصد کراچی اور ملیر کے درمیان رابطہ بہتر بنانا اور ٹریفک کی روانی کو آسان بنانا ہے۔ افتتاحی تقریب سے خطاب کرتے ہوئے میئر مرتضیٰ وہاب نے کہا کہ سڑک کی بحالی سے علاقے کے رہائشیوں اور روزانہ سفر کرنے والے شہریوں کے لیے آمدورفت کی سہولت میں نمایاں بہتری آئی ہے۔ ان کا کہنا تھا کہ بہتر روڈ انفرااسٹرکچر کے باعث کراچی سے ملیر تک سفر کا دورانیہ کم ہو کر تقریباً 15 سے 20 منٹ رہ گیا ہے، جس سے شہریوں کو آمدورفت میں سہولت حاصل ہوگی۔ مرتضیٰ وہاب نے بتایا کہ سڑک کی تعمیر و بحالی سے قبل ضروری معاون انفرااسٹرکچر کا کام مکمل کیا گیا۔ ان کے مطابق ٹریفک سے متعلق انتظامات، سیوریج کا کام اور سڑک کی بنیادی سطح کی تیاری پہلے مکمل کی گئی، جس کے بعد سڑک کی تعمیر و بحالی کا مرحلہ شروع کیا گیا۔ میئر نے کہا کہ سڑکیں تعمیر کرنے سے پہلے زیرِ زمین اور بنیادی انفرااسٹرکچر مکمل کرنا ضروری ہے تاکہ نئی تعمیر شدہ سڑکوں کی پائیداری یقینی بنائی جا سکے اور مستقبل میں بار بار سڑکیں کھودنے کی ضرورت پیش نہ آئے۔ انہوں نے مزید بتایا کہ کراچی میں دیگر اہم سڑکوں کی تعمیر و بحالی کے منصوبوں پر بھی کام جاری ہے۔ مکران روڈ سے منسلک بعض سڑکوں کی تعمیر اور بحالی کا کام شروع کر دیا گیا ہے، جبکہ دیگر سڑکوں کے منصوبوں کے لیے ٹینڈرنگ کا عمل جاری ہے۔ مرتضیٰ وہاب کے مطابق یہ منصوبے کراچی کے روڈ نیٹ ورک کو بہتر بنانے، مختلف علاقوں کے درمیان رابطہ مضبوط کرنے اور ٹریفک کی روانی کو مزید مؤثر بنانے کی وسیع تر حکمت عملی کا حصہ ہیں۔ میئر نے کراچی ایئرپورٹ سے ملیر کینٹ تک ڈوئل کیرج وے منصوبے پر ہونے والی پیش رفت سے بھی آگاہ کیا۔ ان کے مطابق یہ منصوبہ ایئرپورٹ، ملیر اور اطراف کے علاقوں کے درمیان ایک اہم سفری رابطہ فراہم کرے گا۔ انہوں نے بتایا کہ مجوزہ رابطہ کاٹھور اور ایئرپورٹ کے عقبی علاقے تک بھی توسیع پائے گا اور بالآخر موٹروے سے منسلک ہوگا۔ اس منصوبے سے اہم ٹرانسپورٹ کوریڈورز تک رسائی بہتر ہونے کے ساتھ شہریوں، کاروباری اداروں اور تجارتی ٹریفک کی نقل و حرکت میں بھی آسانی متوقع ہے۔ جاری روڈ ڈویلپمنٹ منصوبے کراچی میں اہم سفری راستوں کو جدید بنانے کے ساتھ ضروری بلدیاتی اور زیرِ زمین انفرااسٹرکچر کی بہتری پر بھی توجہ کی عکاسی کرتے ہیں۔ انتظامیہ کا مؤقف ہے کہ سڑکوں کی تعمیر سے پہلے سیوریج اور دیگر زیرِ زمین کام مکمل کرنے سے نئی سڑکوں کو مستقبل میں ہونے والے نقصان سے محفوظ رکھا جا سکتا ہے اور شہری انفرااسٹرکچر کو زیادہ پائیدار بنایا جا سکتا ہے۔ میمن گوٹھ روڈ کی بحالی مکمل ہونے اور مکران روڈ سمیت دیگر منصوبوں پر تعمیراتی و ٹینڈرنگ سرگرمیوں کے آغاز کے بعد کراچی کی انتظامیہ شہر کے روڈ نیٹ ورک کو مزید وسعت دینے اور جدید بنانے کی کوشش کر رہی ہے، جس کا مقصد سفر کا دورانیہ کم کرنے اور مختلف علاقوں کے درمیان رابطہ بہتر بنانا ہے۔