Published: February 17, 2026 - 4:28 PM
Karachi Upgrades Pumping Infrastructure, Improving Supply Across Multiple Urban Areas
کراچی میں واٹر پمپنگ نظام کی اپ گریڈیشن، شہری علاقوں میں فراہمی میں نمایاں بہتری
▫️ Installation of new pumps and backup generator enables additional 4–5 million gallons daily delivery ▫️ Solar conversion and K-III project form part of long-term urban service stabilization strategy
Karachi | ReNews Pakistan Murtaza Wahab, Chairman of the Karachi Water Corporation and Mayor of Karachi, announced that work is underway to gradually convert pumping stations to solar energy, alongside the installation of modern pumpi...
Murtaza Wahab, Chairman of the Karachi Water Corporation and Mayor of Karachi, announced that work is underway to gradually convert pumping stations to solar energy, alongside the installation of modern pumping equipment to strengthen distribution capacity across key urban zones.
The announcement was made during the inauguration of upgraded systems at the LSR and CI-60 pumping stations near Gulshan-e-Iqbal. Officials confirmed that two new 220-horsepower motors were installed at the LSR station, while three advanced 215-horsepower motors were deployed at CI-60. Additionally, a 500-KVA standby generator has been installed at LSR to ensure uninterrupted operations during power outages.
Authorities reported that the upgrades have significantly improved flow capacity in several densely populated areas, including Garden, Old City Area, Mithadar, Kharadar, Soldier Bazaar, Maripur, Chanesar Town, Jinnah Town, and Gulshan Town. In some locations, delivery levels have increased from seven feet to approximately twelve feet. Overall, the improvements are expected to enable an additional supply of 4 to 5 million gallons per day.
The mayor further stated that work on the K-III bulk supply project is progressing, with efforts underway to complete it by 31 May The project is expected to enhance long-term system capacity and support expanding urban demand. He also urged K‑Electric to ensure consistent electricity provision, noting that power disruptions directly affect pumping operations and service reliability.
Officials emphasized that infrastructure modernization, including solar integration and system upgrades, is essential to strengthening Karachi’s urban service framework and ensuring sustainable delivery for its growing population.