Published: June 4, 2026 - 11:05 AM
Sindh Cabinet Approves Rs 11.198 bn for Karachi Road and Bridge Connectivity Projects
سندھ کابینہ نے کراچی میں سڑکوں اور پلوں کے رابطہ منصوبوں کیلئے 11 ارب 19 کروڑ روپے سے زائد کی منظوری دیدی
▫️Karachi Mega Project to upgrade key corridors including Korangi Link Road, Haji Camp Road, Clifton routes, Scheme 33 roads and Baldia Stadium Road
Karachi: [ReNews Pakistan] The Sindh cabinet has approved development schemes worth Rs 11.198 billion for major road and bridge connectivity projects in Karachi, as part of a broader push to improve urban infrastructure and ease traff...
The Sindh cabinet has approved development schemes worth Rs 11.198 billion for major road and bridge connectivity projects in Karachi, as part of a broader push to improve urban infrastructure and ease traffic pressure across the city.
The approval was granted during a cabinet meeting chaired by the Sindh chief minister. According to an official statement issued by the Chief Minister’s House, the approved schemes will be executed under the Karachi Mega Project and funded through the “New Development Initiatives” allocation of the Annual Development Programme for financial year 2025-26.
The projects include the rehabilitation, improvement and widening of several important roads and transport corridors in different parts of Karachi. These include Haji Ibrahim Essa Road, Haji Camp Road, Korangi Link Road and roads in Clifton connecting to Marine Drive. Development work has also been approved for Mehran Road and Pajero Road in Scheme 33, Korangi Creek Airbase Road, the extension of Jinnah Avenue in Gulzar-i-Hijri and Baldia Stadium Road, which connects Shahrah i Orangi with Hub River Road.
Officials said the road improvement schemes are aimed at strengthening Karachi’s internal connectivity, reducing travel time and improving access between residential, commercial and industrial areas. The selected routes are considered important for daily commuters, public transport movement and commercial activity.
In addition to road rehabilitation, the cabinet also approved the construction of two major bridges in the city. One bridge will be built at Power House Chowrangi in North Karachi, while the second will be constructed at 4-K Chowrangi in Surjani Town. Both locations are considered high-traffic points where congestion has remained a persistent issue for commuters.
To begin implementation, the cabinet sanctioned an initial release of Rs 560 million, which is around five percent of the total estimated cost of the approved Karachi infrastructure schemes. The amount will be released from the current ADP allocation to allow relevant departments to start preparatory and execution work.
The chief minister directed the concerned departments to ensure timely execution of all approved schemes and maintain quality standards during construction. He said development projects must be completed within the given timelines so that citizens can benefit from improved road infrastructure without unnecessary delays.
Separately, the Sindh cabinet also approved Rs 8.824 billion for water supply and drainage schemes across the province. Officials said the funds will be used for multiple projects aimed at upgrading water and sanitation systems in both urban and rural areas.
The cabinet also approved a new framework for receiving Sindh’s 12.5 percent natural gas royalty in kind on a field-to-field basis, instead of receiving it entirely in cash. Officials briefed the meeting that the proposed arrangement could generate an additional Rs 26 billion annually for the provincial government.