Published: July 28, 2026 - 10:12 AM
Tarbela Dam’s Auxiliary Spillway Operated for First Time as Water Inflows Rise
تربیلا ڈیم کا معاون سپل وے پہلی مرتبہ کھول دیا گیا، اضافی پانی کا محفوظ اخراج شروع
▫️WAPDA says the spillway was opened under comprehensive safety protocols during the 2026 flood season to regulate the reservoir level and ensure the safe discharge of additional water
Tarbela | ReNews PakistanThe Water and Power Development Authority has operated the auxiliary spillway of Tarbela Dam for the first time during the 2026 flood season, allowing the controlled discharge of additional water from the reservoir.
The Water and Power Development Authority has operated the auxiliary spillway of Tarbela Dam for the first time during the 2026 flood season, allowing the controlled discharge of additional water from the reservoir.
According to WAPDA, the spillway was operated under comprehensive technical and safety protocols to regulate the reservoir level amid increased water inflows caused by monsoon rains and flows from upstream areas.
The authority said the water situation at Tarbela Reservoir was being continuously monitored. The operation of the auxiliary spillway is intended to maintain the reservoir at a safe level and reduce additional pressure on the dam’s main structures.
The auxiliary spillway is an important component of the dam’s safety system and is used to discharge excess water during periods of unusually high inflows. Officials said the operation was conducted under the supervision of engineers and technical experts, with all necessary precautionary measures in place.
Tarbela Dam is one of Pakistan’s largest water storage and hydropower projects. Improved water availability at the reservoir supports the country’s agricultural requirements and also contributes to increased hydropower generation for the national grid.
WAPDA officials said monitoring of water inflows, reservoir levels and power generation would continue throughout the monsoon and flood season. Further safety measures and controlled water releases will be undertaken whenever required.